Case Study

Sundance Film Festival
2026 Network Deployment

Deploying mission-critical LAN/WAN and Wi-Fi infrastructure across 18 temporary venues in Park City, Utah — a high-stakes, zero-tolerance-for-downtime environment serving thousands of filmmakers, press, and attendees.

TCP/IPLAN/WANWi-Fi 6VLANDHCPDNSNetwork Monitoring
18
Venues Deployed
99.9%
Uptime Achieved
3 Months
Project Duration
0
Critical Incidents
The Challenge

18 venues. Zero downtime tolerance. Temporary infrastructure.

The Sundance Film Festival is one of the world's most prestigious film events, attracting thousands of filmmakers, journalists, industry professionals, and attendees to Park City, Utah every January. The festival operates across 18 temporary venues — from screening rooms to press centers to hospitality lounges — each requiring reliable, high-performance networking for film screenings, live streams, point-of-sale systems, digital signage, and press operations.

The challenge: build a complete enterprise-grade network from scratch in each venue, ensure it performs flawlessly under heavy load, and maintain it around the clock during the festival — all in a compressed timeline where failure isn't an option.

The Solution

End-to-end network deployment and management

Network Design & Build

Designed and deployed LAN/WAN topology for each venue, including IP addressing schemes, VLAN segmentation, and inter-VLAN routing for security isolation between production, guest, and staff networks.

Wi-Fi Deployment

Deployed enterprise wireless access points with optimal RF planning for each venue space, ensuring full coverage for high-density environments — from intimate screening rooms to large event halls.

Security & Segmentation

Implemented network segmentation with VLANs to isolate sensitive production traffic from guest Wi-Fi. Configured firewall rules and access controls for each network segment.

Infrastructure Management

Configured switches, routers, and cabling infrastructure for each venue. Managed DHCP, DNS, and NTP services to ensure consistent connectivity across all sites.

Real-Time Monitoring

Deployed monitoring dashboards to track network health, traffic patterns, and device status across all 18 venues in real time — enabling proactive issue resolution before users were affected.

Tier 2 Support

Provided on-site Tier 2 troubleshooting throughout the festival, diagnosing and resolving network issues under time pressure with zero tolerance for extended outages.

Gallery

On the ground at Sundance

Sundance Deployment 1
Sundance Deployment 2
Sundance Deployment 3
Sundance Deployment 4
Sundance Deployment 5
Sundance Deployment 6
The Results

Flawless execution under pressure

All 18 venues were deployed on schedule with enterprise-grade network infrastructure that performed flawlessly throughout the entire festival. Zero critical incidents. Zero extended outages.

The network supported everything from 4K film screenings and live press conferences to POS terminals and digital signage — all running simultaneously across segmented, secure network environments.

18 venues deployed on schedule
99.9% uptime across all venues
Zero critical incidents during festival
Full network documentation handoff
Segmented prod/guest/staff networks
Real-time monitoring across all sites